[1] Lim A, Rodrigues B, Xiao F, et al. Crane scheduling with spatial constraints[J]. Naval Research Logistics, 2004, 51 (3): 386-406. [2] Zhu Y, Lim A. Crane scheduling with non-crossing constrain[J]. Journal of the Operation Research Society, 2006, 57(12): 1464-1471. [3] Lim A, R Rodrigues B, Xu Z. A m-parallel crane scheduling problem with a non-crossing Constraint[J]. Naval Research Logistics, 2007, 54 (2): 115-127. [4] Liu J, Wan Y W, Wang L. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures[J]. Navla Research Logistics, 2006, 53(1), 60-74. [5] Lee D H, Wang H Q, Miao L X. Quay crane scheduling with non-interference in port container terminals[J]. Transportation Research Part E, 2008, 44 (1): 124-135. [6] 范志强,乐美龙,包节.考虑作业效率差异的同类岸桥作业调度优化[J].工业工程与管理,2012,17(2):33-38. [7] Kim K H, Park Y M. A crane scheduling method for port container terminals[J]. European Journal of Operational Research, 2004, 156 (3): 752-768. [8] Moccia L, Cordeau J F, Gaudioso M, Laporte G. A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal[J]. Naval Research Logistics, 2006, 53(1): 45-59. [9] Sammarra M, Cordeau J F, Laporte G, et al. A tabu search heuristic for the quay crane scheduling problem[J]. Journal of Scheduling, 2007, 10: 327-336. [10] Bierwirth C, Meisel F. A fast heuristic for quay crane scheduling with interference constraints[J]. Journal of Scheduling, 2009, 12: 345-360. [11] 曾庆成,高宇.集装箱码头装卸桥调度优化模型与算法[J].计算机工程与应用,2006,42(32):217-219. [12] 韩笑乐,梁亮,陆志强等.集装箱码头岸吊作业调度建模及调度策略研究[J].工业工程与管理,2009,14(5):20-26. [13] 李晨,陆志强,陈璐.具有岸桥碰撞和甲板约束的岸桥混合装卸作业调度优化[J].上海交通大学学报,2010,44(8):1159-1164. |