[1] Salmasnia A, Mokhtari H. A robust scheduling of projects with time, cost, and quality considerations[J]. Int J Adv Manuf Technol, 2012, 60: 631-642. [2] Liberatore M J, Pollack-johnson B. Improving project management decision making by modeling quality, time, and cost continuously[J]. IEEE Transactions on Engineering Management, 2013, 60(3): 518-528. [3] Tareghian H R, Taheri S H. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search[J]. Applied Mathematics and Computation, 2007, 190(2): 1136-1145. [4] Monghasemi S, Reza M, Ali M, Fasaee K, Adamowski J. Expert systems with applications a novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects[J]. Expert Systems With Applications, 2015, 42(6): 3089-3104. [5] Omachonu V K, Suthummanon S, Einspruch N G. The relationship between quality and quality cost for a manufacturing company[J]. International Journal of Quality & Reliability Management, 2004, 21(3): 277-290. [6] Paquin J P, Couillard J, Ferrand D J. Assessing and controlling the quality of a project end product: the earned quality method[J]. IEEE Transactions on Engineering Management, 2000, 47(1): 88-97. [7] Pollack-Johnson B, Liberatore M J. Incorporating quality considerations into project time/cost tradeoff analysis and decision making[J]. IEEE Transactions on Engineering Management, 2006, 53(4): 534-542. [8] Tavana M, Abtahi A, Khalili-damghani K. Expert systems with applications a new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems[J]. Expert Systems With Applications, 2014, 41(4): 1830-1846. [9] Tiwari V, Patterson J H, Mabert V A. Scheduling projects with heterogeneous resources to meet time and quality objectives[J]. European Journal of Operational Research, 2009, 193(3): 780-790. [10] Zhang H, Xing F. Automation in construction fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction[J]. Automation in Construction, 2010, 19(8): 1067-1075. [11] Babu A J G, Suresh N. Project management with time, cost, and quality considerations[J]. European Journal of Operational Research, 1996, 88(2): 320-327. [12] Khang D B, Myint Y M. Time, cost and quality trade-off in project management: a case study[J]. International Journal of Project Management, 1999, 17(4): 249-256. [13] Kim J, Kang C, Hwang I. A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem[J]. International Journal of Project Management, 2012, 30(2): 264-272. [14] Perez-Gonzalez P, Framinan J. A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: Multi-agent scheduling problems[J]. European Journal of Operational Research, 2014, 235: 1-16. [15] Li H, Zhang Q. Multiobjective optimization problems with complicated pareto sets, MOEA/D and NSGA-II[J]. IEEE Transactions on Evolutionary Computation, 2009, 13(2): 284-302. [16] Azadeh A, Shoja BM, Ghanei S, Sheikhalishahi M. A multi-objective optimization problem for multi-state series-parallel systems: a two-stage flow-shop manufacturing system[J]. Reliability Engineering and System Safety, 2015, 136: 62-74. [17] Luo J, Li X, Chen M, Liu H. A novel hybrid shuffled frog leaping algorithm for vehicle routing problem with time windows[J]. Information Sciences, 2015, 316: 266-292. [18] 纪昌明,李继伟,张新明,等.基于免疫蛙跳算法的梯级水库群优化调度[J].系统工程理论与实践,2013,33(8):2125-2132. [19] Fang C, Wang L. An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem[J]. Computers and Operation Research, 2012, 39(5): 890-901. [20] Li J, Pan Q, Xie S. An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems[J]. Applied Mathematics and Computation, 2012, 218(18): 9353-9371. [21] Eusuff M, Lansey K, Pasha F. Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization[J]. Engineering Optimization, 2006, 38: 129-154. [22] 李佳媛,何正文.基于资源随机中断的反应性多模式项目调度优化[J].运筹与管理,2015,24(6):44-50. |