Reentrant Green Scheduling of Laminar Flow Surgery under Multi-stakeholder Objectives
HUANG Li1,2, YE Chunming1, GENG Kaifeng3
1. School of Business, University of Shanghai for Science and Technology, Shanghai 200093, China; 2. Economics and Management School, Panzhihua University, Panzhihua 617000, China; 3. Information Construction and Management Center, Nanyang Institute of Technology, Nanyang 473004, China
HUANG Li, YE Chunming, GENG Kaifeng. Reentrant Green Scheduling of Laminar Flow Surgery under Multi-stakeholder Objectives[J]. Operations Research and Management Science, 2024, 33(2): 78-85.
[1] WANG Y, TANG J F, PAN Z D, et al. Particle swarm optimization-based planning and scheduling for a laminar-flow operating room with downstream resources[J]. Soft Computing, 2015, 19(10): 2913-2926. [2] 罗利,石应康.医疗服务资源调度优化理论、方法及应用[M].北京:科学出版社,2014. [3] 王凌,王晶晶,吴楚格.绿色车间调度优化研究进展[J].控制与决策,2018,33(3):385-391. [4] 姚远远,叶春明.考虑节能的改进多目标樽海鞘群算法TFT-LCD面板阵列制程调度问题[J].中国机械工程,2019,30(24):2994-3003. [5] 董君,叶春明.具有学习效应的半导体晶圆制造绿色车间调度问题研究[J].运筹与管理,2021,30(4):217-223. [6] 邓富民,梁学栋,刘爱军,等.多资源约束下改进NSGA-Ⅱ算法的手术调度[J].系统工程理论与实践,2012,32(6):1337-1345. [7] 张政,谢晓岚,耿娜.多目标优化下的手术室分派调度问题[J].上海交通大学学报,2012,46(12):1983-1988. [8] ZHU S W, FAN W J, LIU T Z, et al. Dynamic three-stage operating room scheduling considering patient waiting time and surgical overtime costs[J]. Journal of Combinatorial Optimization, 2020, 39(1): 185-215. [9] 王恺,陈夏,陈丽君.服务时间变动下的可重入手术调度[J].运筹与管理,2020,29(11):144-151. [10] ABEDINI A, LI W, YE H H. An optimization model for operating room scheduling to reduce blocking across the perioperative process[J]. Procedia Manufacturing, 2017, 10: 60-70. [11] YE H H, LI W, ABEDINI A, et al. An effective and efficient heuristic for no-wait flow shop production to minimize total completion time[J]. Computers and Industrial Engineering, 2017, 108: 57-69. [12] WANG K, QIN H, HUANG Y, et al. Surgery scheduling in outpatient procedure center with reentrant patient flow and fuzzy service times[J]. Omega-International Journal of Management Science, 2021, 102: 1-14. [13] DEB K, PRATAP A, AGARWAL S, et al. A fast and elitist multiobjective genetic algorithm: NSGA-II[J]. IEEE Transactions on Evolutionary Computation, 2002, 6(2): 182-197. [14] 姚友杰,钱斌,胡蓉.混合EDA求解多目标零等待作业车间调度问题[J].控制工程,2020,27(3):418-423. [15] MEJIA G, YURASZACK F. A self-tuning variable neighborhood search algorithm and an effective decoding scheme for open shop scheduling problems with travel/setup times[J]. European Journal of Operational Research, 2020, 285(2): 484-496. [16] 成舒凡,叶春明.嵌入疲劳效应和学习效应的应急手术调度研究[J].计算机工程与应用,2022,58(13):295-302.