[1] Nishimura E, Imai A, Stratos P. Berth allocation planning in the public berth system by genetic algorithms[J]. European Journal of Operational Research, 2001, 131(2): 282-292. [2] Imai A, Nishimura E, Stratos P. Berth allocation with service priority[J]. Transportation Research Part B, 2003, 37(5): 437-457. [3] Kim K H, Moon K C. Berth scheduling by simulated annealing[J]. Transportation Research Part B, 2003, 37(6): 541-560. [4] Imai A, Sun X, Nishimura E et al. Berth allocation in a container port: using a continuous location space approach[J]. Transportation Research Part B, 2005, 39(3): 179-221. [5] Imai A, Nishimura E, Hattori M, et al. Berth allocation at indented berths for mega-containervessels[J]. European Journal of Operational Research, 2007, 179(2): 579-593. [6] Wang F, Lim A. A stochastic beam search for the berth allocation problem[J]. Decision Support Systems, 2007, 42(4): 2186-2196. [7] Park Y M, Kim K H. A scheduling method for berth and quay cranes[J]. OR Spectrum, 2003, 25(1): 1-23. [8] Imai A, Chen H C, Nishimura E, et al. The simultaneous berth and quay crane allocation problem[J]. Transportation Research Part E, 2008, 44(5): 900-920. [9] Liang C, Huang Y, Yang Y. A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning[J]. Computers & Industrial Engineering, 2009, 56(3): 1021-1028. [10] Han X L, Lu Z Q, Xi L F. A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time[J]. European Journal of Operational Research, 2010, 207(3): 1327-1340. [11] 周鹏飞,康海贵.面向随机环境的集装箱码头泊位-岸桥分配方法[J].系统工程理论与实践,2008,28(1):161-169. [12] Zhen L, Chang D F. A bi-objective model for robust berth allocation scheduling[J]. Coputers & Industrial Engineering, 2012; 63(1): 262-273. [13] 曾庆成,胡祥培,杨忠振.集装箱码头泊位分配-装卸桥调度干扰管理模型[J].系统工程理论与实践,2010,30(11):2026-2035. [14] Wu C W, Brown K N, Beck J C. Scheduling with uncertain durations: modeling-robust scheduling with constraints[J]. Computers & Operations Research, 2009, 36(8): 2348-2356. [15] Goren S, Sabuncuoglu I. Robustness and stability measures for scheduling: single machine environment[J]. IIE Transactions, 2008, 40: 66-83. [16] Held M, Wolfe P, Crowder H P. Validation of sub-gradient optimization[J]. Mathematical Programming, 1974, 6: 62-88. |