[1] Graham R L, Lawler E L, Lenstra J K, Rinnooy Kan A H G. Optimization and approximation in deterministic sequencing and scheduling[J]. A survey. Annals of Discrete Mathematics, 1979, 5(2): 287-326. [2] Deng X T, Poon C K, Zang Y Z. Approximation algorithms in batch processing[J]. Journal of Combinatorial Optimization, 2003, 7: 247-257. [3] Zhang G C, Cai X Q, Wong C K. On-line algorithms for minimizing makespan on batch processing machines[J]. Naval Research Logistics, 2001, 48: 241-258. [4] Poon C K, Yu W C. A flexible on-line scheduling algorithm for batch machine with infinite capacity[C],5th Conference on Optimization: Techniques and Application(ICOTA’01), Hong Kong, December 2001. [5] Poon C K, Yu W C. A flexible on-line scheduling algorithm for batch machine with infinite capacity[J]. Annals of Operations Research, 2005, 133: 175-181. [6] Liu Z H, Yu W C. Scheduling one batch processor subject to job release dates[J]. Discrete Applied Maths, 2000, 105: 129-136. [7] Richardand P Q, Ridouard F. On-line scheduling on a single batching machine to minimize the makespan[C]. 6th International Conference on Industrial Engineering and Production Management(IEPM’03). Parto(Portugal). May, 2003. [8] 原晋江, 农庆琴.平行批排序最小化最大完工时间在线算法的一个注记[J].郑州大学学报(理学版),2006,38(3):1-3. [9] Poon C K, Yu W C. On-line scheduling algorithm for a batch machine with finite capacity[J]. Journal of Combinatorial Optimization, 2005, 9(2): 167-186. [10] Liu P H, Lu X W, Fang Y. A best possible deterministic on-line algorithm for minimizing makespan on parallel batch machines[J]. Journal of Scheduling , 2012, 15: 77-81. [11] Tian J, Cheng T C E, Ng C T, Yuan J J. Online scheduling on unbounded parallel-batch machines to minimize the makespan[J]. Information Processing Letters, 2009, 109: 1211-1215. [12] Zhang G C, Cai X Q, Wong C K. Optimal on-line algorithms for scheduling on parallel batch processing machines[J]. IIe Transactions, 2003, 35: 175-181. |