[1] 方晨,王凌.资源约束项目调度研究综述[J].控制与决策,2010,25(5):641-650,656. [2] 彭武良,王成恩.产品开发项目的离散时间/成本/质量平衡问题研究[J].控制与决策,2009,24(3):423-428. [3] Al-Fawzan M A, Haouari M. A bi-objective model for robust resource-constrained project scheduling[J]. International Journal of Production Economics, 2005, 96(2): 175-187. [4] Demeulemeester E, Vanhoucke M. New computational results on the discrete time/cost trade-off problem in project networks[J]. Journal of the Operational Research Society, 1998, 49(11): 1153-1163. [5] Deckro R F, Hebert J E, Verdini W A, Grimsrud P H, Venkateshwar S. Nonlinear time/cost tradeoff models in project management[J]. Computers & Industrial Engineering, 1995, 28(2): 219-229. [6] Erenguc S, Ahn T, Conway D G. The resource constrained project scheduling problem with multiple crashable modes: an exact solution method[J]. Naval Research Logistics, 2001, 48(2): 107-127. [7] Hazlr Ö, Haouari M, Erel E. Discrete time/cost trade-off problem: a decomposition-based solution algorithm for the budget version[J]. Computers & Operations Research, 2010, 37(4): 649-655. [8] Van De Vonder S, Demeulemeester E, Herroelen W, Leus R. The trade-off between stability and makespan in resource-constrained project scheduling[J]. International Journal of Production Research, 2006, 44(2): 215-236. [9] 李洪波,徐哲.鲁棒项目调度研究综述[J].系统工程,2014(2):123-131. [10] Ke H, Ma W, Ni Y. Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem[J]. Applied Mathematics & Computation, 2009, 215(1): 308-313. [11] 何正文,刘人境,徐渝.基于随机活动工期的资源约束项目鲁棒性调度优化[J].系统工程理论与实践,2013,33(3):650-659. [12] 庞南生,孟俊姣.多目标资源受限项目鲁棒调度研究[J].运筹与管理,2012,21(3):27-32. [13] 寿涌毅,王伟.基于鲁棒优化模型的项目调度策略遗传算法[J].管理工程学报,2009,23(4):148-152. [14] 何立华,孔云霄.基于活动延期风险加权时差的资源受限项目调度鲁棒性度量[J].运筹与管理,2015,24(5):167-174. [15] Herroelen W, Leus R. The construction of stable project baseline schedules[J]. European Journal of Operational Research, 2004, 156(3): 550-565. [16] 王杜娟,刘锋,王建军,王延章.加工时间可控单机加权总完工时间Pareto优化研究[J].运筹与管理,2016,25(1):35-45. [17] 刘士新,宋健海.模糊多目标资源受限项目调度问题的优化方法[J].系统工程学报,2008,23(6):744-750. [18] Yamashita D S, Armentano V A, Laguna M. Robust optimization models for project scheduling with resource availability cost[J]. Journal of Scheduling, 2007, 10(1): 67-76. [19] De P, Dunne E J, Ghosh J B, Wells C E. The discrete time-cost tradeoff problem revisited[J]. European Journal of Operational Research, 1995, 81(2): 225-238. [20] Kolisch R, Sprecher A. PSPLIB——a project scheduling problem library[J]. European Journal of Operational Research, 1996, 96(1): 205-216. |