[1] 颜波,黄必清.网格研究现状及其在制造业中的应用[J].计算机集成制造系统,2004,(9):1021-1030. [2] 刘丽兰,俞涛,施战备,方明伦.自组织制造网格及其任务调度算法[J].计算机集成制造系统,2003,6:449- 455. [3] Liu Lilan,Yu Tao, He Yu’an. A QoS-based GFAM scheduling approach for manufacturing grid[C].Proceedings of the 2005 The Fifth International Conference on Computer and Information Technology. [4] 马雪芬,戴旭东,孙树栋.面向网络化制造的制造资源优化配置研究[J].计算机集成制造系统,2004,5:523-527. [5] Raafat Aburukba, Hamada Ghenniwa, Weiming Shen. agent-based dynamic scheduling approach for collaborative manufacturing[C].Proceedings of the 2007 11th International Conference on Computer Supported Cooperative Work in Design. [6] 刘海霞, 李仁旺,李学,等.基于遗传模拟退火算法的制造网格资源调度策略[J].计算机工程与应用,2008,44(6):234-237. [7] 周长春,殷国富,吴迎春,等.面向制造网格的制造资源优化配置策略研究[J]. 四川大学学报(工程科学版),2009.3:237-244. [8] Moore R E. Methods and applications of interval analysis[M]. Pennsylvania: Philadelphia, SIAM, 1966. [9] 达庆利,刘新旺.区间数线性规划及其满意解[J].系统工程理论与实践,1999,4:3-7. [10] abbasimolai A. Khorram, linear programming problem with interval coefficients and interpretation for its constraints[J]. Iranian Journal of Science & Technology, Transaction A, 2007, 4(31): 369-390. [11] Sengupta A, Pal T K. On comparing interval numbers[J]. European Journal of Operational Research, 2000, 127: 28- 43. [12] 程志强,戴连奎,孙优贤.区间参数不确定系统优化的可行性分析[J].自动化学报,2004,30(3):455- 459. [13] 曹洪医.动态联盟中伙伴选择问题的区间规划模型及其求解[J].中国管理科学,2006,14(6):86-90. [14] Jiang C, Han X, Liu G R. A nonlinear interval number programming method for uncertain optimization problems[J]. European Journal of Operational Research, 2008, 188 (1): 1-13. [15] 陶友瑞,韩旭,姜潮.一种基于区间模型的多学科不确定性设计优化方法[J].中国机械工程,2009,23(20):2782-2787. [16] Atanu Senguptaa, Tapan Kumar Pala, Debjani Chakraborty. Interpretation of inequality constraints involving interval coefficients and a solution to interval linear programming[J]. Fuzzy Sets and Systems, 2001, (119): 129-138. [17] 郭子雪,齐美然,张强.基于区间数的应急物资储备库最小费用选址模型[J].运筹与管理,2010,2:15-20. |