[1] 苏春施,杨梅,郑玉巧.基于分派规则和离散人工蜂群算法的再制造系统生产调度[J].工业工程与管理,2016,21(5):56-61. [2] Fang C C, Lai M H, Huang Y S. Producti-on planning of new and remanufacturing products in hybrid production systems[J]. Computers & Industrial Engineering, 2017, 108: 88-99. [3] 董美曾,陈伟达.模糊环境下再制造系统批量调度研究[J].工业工程与管理,2012,17(6):34-40,46. [4] 刘明周,张玺,刘从虎,张铭鑫,葛茂根.不确定环境下再制造加工车间生产调度优化方法[J].机械工程学报,2014,50(10):206-212. [5] 崔少东,陈伟达.考虑碳排放和加工时间可变的废钢铁再制造生产调度[J].工业工程与管理,2016,21(3):40-49. [6] Giglioa D, Paoluccib M, Roshanib A. In-tegrated lot sizing and energy-efficient job shop scheduling problemin manufacturing/remanufacturing sys-tems[J]. Journal of Cleaner Production, 2017, 148: 624-641. [7] Zhang R, Ong S K, Nee A Y C. A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling[J]. Applied Soft Computing, 2015, 37: 521-532. [8] Aras N, Boyaci T, Verter V. The effect of categorizing returned products in remanufacturing[J]. Lie Transactions, 2004, 36(4): 319-331. [9] Behret H, Korugan A. Performance analysis of a hybrid system under quality impact of returns[J]. Computers & Industrial Engineering, 2009, 56(2): 507-520. [10] Denizel M, Ferguson M, Souza G C. Mult-iperiod remanufacturing planning with uncertain quality of inputs[J]. Engineering Management, 2010, 57(3): 394-404. [11] 李成川,李聪波,曹华军,易茜.基于GERT图的废旧零部件不确定性再制造工艺路线模型[J].计算机集成制造系统,2012,18(2):298-305. [12] Wei C, Li Y, Cai X. Robust optimal policies of production and inventory with uncertain returns and demand[J]. International Journal of Production Economics, 2011, 134(2): 357-367. [13] 张红宇,高阳,马华.基于可变长工序编码的再制造生产调度优化方法[J].计算机应用研究,2010,27(3):871-873,88. [14] 张红宇,高阳.再制造生产计划与调度的研究进展[J].科研管理,2011,32(5):120-128. [15] 万延花,陈伟达.需求不确定的再制造批量决策[J].系统管理学报,2012,21(2):270-274. [16] 冯亚.废旧零部件再制造工艺方案决策与优化调度方法研究[D].重庆:重庆大学,2016. [17] Polotski V, Kenne J P, Gharbi A. Optim-al production scheduling for hybrid manufacturing-remanufacturing systems with setups[J]. Journal of Manufacturing Systems, 2015, 37: 703-714. [18] 温海骏,刘明周,刘长义,刘从虎.不确定环境下回收发动机拆卸调度方法[J].计算机集成制造系统,2015,21(5):1279-1286. [19] 郑璐,顾幸生.不确定条件下的零等待Flow shop生产调度问题[J].华东理工大学学报,2004,30:188-193,198. [20] 俞胜平,庞新富,柴天佑,郑秉霖.加工时间不确定的炼钢连铸生产调度问题研究[J].控制与决策,2009,24(10):1467-1472. [21] Lenstra J K, Kan A H G R. Computationalcomplexity of discrete optimization pr-oblems[J]. Annals of Discrete Mathematics, 1970, 4: 121-140. [22] 余建军,孙树栋,王军强,杜先进.免疫模拟退火算法及其在柔性动态Job Shop中的应用[J].中国机械工程,2007,18(7):793-799. |