[1] OLIVER WYMAN. Update: Impact of covid-19 on commercial MRO[R/OL].[2021-07-10]. https://www.oliverwyman.com/content/dam/oliver-wyman/v2/media/July_Update_Impact_of_COVID19_on_Commercial_MRO_2020.pdf. [2] KINNISON H A, SIDDIQUI T. Aviation maintenance management(2nd edition)[M]. McGraw-Hill, 2013. [3] STEINER A. A heuristic method for aircraft maintenance scheduling under various constraints[C]//Proceedings of the 6th Swiss Transport Research Conference, March 15-17, 2006, Monte Verità / Ascona, Switzerland. STRC, 2006. [4] LI H Y, ZUO H F, LEI D, et al. Optimal combination of aircraft maintenance tasks by a novel simplex optimization method[J]. Mathematical Problems in Engineering, 2015(11): 169310. [5] DENG Q, SANTOS B F, CURRAN R. A practical dynamic programming based methodology for aircraft maintenance check scheduling optimization[J]. European Journal of Operational Research, 2020, 281(2): 256-273. [6] WITTEMAN M, DENG Q, SANTOS B F. A bin packing approach to solve the aircraft maintenance task allocation problem[J]. European Journal of Operational Research, 2021, 294(1): 365-376. [7] BARNHART C, BOLAND N L, CLARKE L W, et al. Flight string models for aircraft fleeting and routing[J]. Transportation Science, 1998, 32(3): 208-220. [8] LAN S, CLARKE J P, BARNHART C. Planning for robust airline operations: Optimizing aircraft routings and flight departure times to minimize passenger disruptions[J]. Transportation Science, 2006, 40(1): 15-28. [9] SARAC A, BATTA R, RUMP C M. A branch-and-price approach for operational aircraft maintenance routing[J]. European Journal of Operational Research, 2006, 175(3): 1850-1869. [10] MAHER S J, DESAULNIERS G, SOUMIS F. Recoverable robust single day aircraft maintenance routing problem[J]. Computers & Operations Research, 2014, 51: 130-145. [11] MAHER S J, DESAULNIERS G, SOUMIS F. The daily tail assignment problem under operational uncertainty using look-ahead maintenance constraints[J]. European Journal of Operational Research, 2018, 264(2): 534-547. [12] HANE C A, BARNHART C, JOHNSON E L, et al. The fleet assignment problem: Solving a large-scaleinteger program[J]. Mathematical Programming, 1995, 70(1-3): 211-232. [13] LIANG Z, CHAOVALITWONGSE W A, HUANG H C, et al. On a new rotation tour network model for aircraft maintenance routing problem[J]. Transportation Science, 2011, 45(1): 109-120. [14] LIANG Z, CHAOVALITWONGSE W A. A network-based model for the integrated weekly aircraft maintenance routing and fleet assignment problem[J]. Transportation Science, 2013, 47(4): 493-507. [15] LIANG Z, FENG Y, ZHANG X N, et al. Robust weekly aircraft maintenance routing problem and the extension to the tail assignment problem[J]. Transportation Research Part B:Methodological, 2015, 78: 238-259. [16] KHALED O, MINOUX M, MOUSSEAU V, et al. A compact optimization model for the tail assignment problem[J]. European Journal of Operational Research, 2018, 264(2): 548-557. [17] ABARA J. Applying integer linear programming to the fleet assignment problem[J]. Interfaces, 1989, 19(4): 20-28. [18] CLARKE L, JOHNSON E, NEMHAUSER G, et al. The aircraft rotation problem[J]. Annals of Operations Research, 1997, 69: 33-46. [19] HAOUARI M, SHAO S, SHERALI H D. A lifted compact formulation for the daily aircraft maintenance routing problem[J]. Transportation Science, 2013, 47(4): 508-525. [20] BASDERE M, BILGE U. Operational aircraft maintenance routing problem with remaining time consideration[J]. European Journal of Operational Research, 2014, 235(1): 315-328. [21] SAFAEI N, JARDINE A K S. Aircraft routing with generalized maintenance constraints[J]. Omega, 2018, 80: 111-122. [22] GRÖNKVIST M. Accelerating column generation for aircraft scheduling using constraint propagation[J]. Computers & Operations Research, 2006, 33(10): 2918-2934. [23] 朱星辉,朱金福,高强.基于约束编程的飞机排班问题研究[J].交通运输系统工程与信息,2011,11(6):151-156. [24] SANCHEZ D T, BOYACr B, ZOGRAFOS K G. An optimisation framework for airline fleet maintenance scheduling with tail assignment considerations[J]. Transportation Research Part B: Methodological, 2020, 133: 142-164. [25] EGGENBERG N, SALANI M, BIERLAIRE M. Constraint-specific recovery network for solving airline recovery problems[J]. Computers & Operations Research, 2010, 37(6): 1014-1026. [26] LIANG Z, XIAO F, QIAN X W, et al. A column generation-based heuristic for aircraft recovery problem with airport capacity constraints and maintenance flexibility[J]. Transportation Research Part B: Methodological, 2018, 113: 70-90. [27] VINK J, SANTOS B F, VERHAGEN W J C, et al. Dynamic aircraft recovery problem: An operational decision support framework[J]. Computers & Operations Research, 2020, 117: 104892. [28] FEO T A, BARD J F. Flight scheduling and maintenance base planning[J]. Management Science, 1989, 35(12): 1415-1432. [29] GOPALAN R. The aircraft maintenance base location problem[J]. European Journal of Operational Research, 2014, 236(2): 634-642. [30] QIN Y C, ZHANG J H, CHAN F T S, et al. A two-stage optimization approach for aircraft hangar maintenance planning and staff assignment problems under MRO outsourcing mode[J]. Computers & Industrial Engineering, 2020, 146: 20. [31] AHMAD R, KAMARUDDIN S. An overview of time-based and condition-based maintenance in industrial application[J]. Computers & Industrial Engineering, 2012, 63(1): 135-149. [32] RENGASAMY D, MORVAN H P, FIGUEREDO G P. Deep learning approaches to aircraft maintenance, repair and overhaul: A Review[C]//2018 21st International Conference on Intelligent Transportation Systems(ITSC), November 4-7, 2018, Maui, Hawaii, USA. Piscataway: IEEE, 2018: 150-156. |