[1] 李建斌,周泰,徐礼平,戴宾.货运O2O平台有时间窗同城零担集货匹配优化决策[J].系统工程理论与实践,2020,40(4):978-988. [2] 刘松,邵毅明,彭勇,肖云鹏.应急救援物资多式联运路径优化[J].中国安全科学学报,2019,29(12):152-157. [3] Xiong G, Wang Y. Best routes selection in multimodal networks using multi-objective genetic algorithm[J]. Journal of Combinatorial Optimization, 2014, 28(3): 655-673. [4] Liu S, Peng Y, Song Q, et al. The robust shortest path problem for multimodal transportation considering timetable with interval data[J]. Systems Science & Control Engineering, 2018, 6(2): 68-78. [5] Kengpol A, Meethom W, Tuominen M. The development of a decision support system in multimodal transportation routing within Greater Mekong sub-region countries[J]. International journal of production economics, 2012, 140(2): 691-701. [6] Chang T S. Best routes selection in international intermodal networks[J]. Computers & operations research, 2008, 35(9): 2877-2891. [7] Carlsson J G, Song S. Coordinated logistics with a truck and a drone[J]. Management Science, 2018, 64(9): 4052-4069. [8] Ayar B, Yaman H. An intermodal multicommodity routing problem with scheduled services[J]. Computational optimization and applications, 2012, 53(1): 131-153. [9] Fazayeli S, Eydi A, Kamalabadi I N. Location-routing problem in multimodal transportation network with time windows and fuzzy demands: presenting a two-part genetic algorithm[J]. Computers & Industrial Engineering, 2018, 119: 233-246. [10] Bevrani B, Burdett R L, Bhaskar A, et al. A capacity assessment approach for multi-modal transportation systems[J]. European Journal of Operational Research, 2017, 263(3): 864-878. [11] Verma M, Verter V, Zufferey N. A bi-objective model for planning and managing rail-truck intermodal transportation of hazardous materials[J]. Transportation research part E: logistics and transportation review, 2012, 48(1): 132-149. [12] Wang Z, Sheu J B. Vehicle routing problem with drones[J]. Transportation research part B: methodological, 2019, 122: 350-364. [13] Moccia L, Cordeau J F, Laporte G, et al. Modeling and solving a multimodal transportation problem with flexible-time and scheduled services[J]. Networks, 2011, 57(1): 53-68. [14] Demir E, Burgholzer W, Hrušovský M, et al. A green intermodal service network design problem with travel time uncertainty[J]. Transportation Research Part B: Methodological, 2016, 93: 789-807. [15] 汤银英,戴炜东,陈思.考虑多节点 时间窗差异的集装箱多式联运路径选择研究[J].交通运输工程与信息学报,2020,18(01):34-42. [16] 陈钉均,李尧,倪少权,杨尧.收货时间窗软约束下绿色多式联运路径优化[J].计算机仿真,2020,37(04):209-214. [17] 刘松,邵毅明,彭勇.碳排放限制下的冷藏集装箱多式联运路径优化[J].应用数学和力学,2020,41(02):204-215. [18] 郑红星,王传宇,吴云强.考虑碳排放的多式联运路径优化研究[J].中国水运(下半月),2019,19(12):67-69. |