[1] 刘富强.天津港深水泊位移位疏浚工艺研究与应用[J].水道港口,2006,27(4):241-242. [2] Bierwirth C, Meisel F. A survey of berth allocation and quay crane scheduling problems in container terminals[J]. European Journal of Operational Research, 2010, 202(3): 615-627. [3] Bierwirth C, Meisel F. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals[J]. European Journal of Operational Research, 2015, 244(3): 675-689. [4] Carlo H J, Vis I F A, Roodbergen K J. Seaside operations in container terminals: literature overview, trends, and research directions[J]. Flexible Services and Manufacturing Journal, 2015, 27: 224-262. [5] Park Y M, Kim K H. A scheduling method for berth and quay cranes[J]. OR Spectrum, 2003, 25(1): 1-23. [6] Giallombardo G, Moccia L, Salani M, et al. Modeling and solving the tactical berth allocation problem[J]. Transportation Research Part B-Methodological, 2010, 44(2): 232-245. [7] Meisel F, Bierwirth C. A framework for integrated berth allocation and crane operations planning in seaport container terminals[J]. Transportation Science, 2013, 47(2): 131-147. [8] Hu Q M, Hu Z H, Du Y Q. Berth and quay-crane allocation problem considering fuel consumption and emissions from vessels[J]. Computers & Industrial Engineering, 2014, 70: 1-10. [9] Zhen L. Tactical berth allocation under uncertainty[J]. European Journal of Operational Research, 2015, 247(3): 928-944. [10] Türkogˇullarl Y B, Takln Z C, Aras N, et al. Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals[J]. European Journal of Operational Research, 2016, 254(3): 985-1001. [11] Zhen L, Liang Z, Zhuge D, et al. Daily berth planning in a tidal port with channel flow control[J]. Transportation Research Part B: Methodological, 2017, 106: 193-217. [12] Wang K, Zhen L, Wang S, et al. Column generation for the integrated berth allocation, quay crane assignment, and yard assignment problem[J]. Transportation Science, 2018, 52(4): 812-834. [13] Jiao X, Zheng F, Liu M, et al. Integrated berth allocation and time-variant quay crane scheduling with tidal impact in approach channel[J]. Discrete Dynamics in Nature and Society, vol. 2018, Article ID 9097047, 19 pages, 2018. [14] 周鹏飞,康海贵.面向随机环境的集装箱码头泊位-岸桥分配方法[J].系统工程理论与实践,2008,28(1):161-169. [15] 董盼,胡志华,陶莎.基于岸桥成本分析的集装箱港口泊位和岸桥分配问题[J].大连海事大学学报,2013,39(2):60-64. [16] 乐美龙,刘秀玲.基于泊位偏好与岸桥干扰的泊位和岸桥分配[J].运筹与管理,2014,23(1):90-100. [17] 杨华龙,滕川川.基于挤压算法的集装箱码头泊位与岸桥联合调度优化[J].大连海事大学学报,2014,40(3):8-12. [18] 郝杨杨,李军军,黄有方.考虑服务公平性的连续泊位-岸桥集成分配[J].华中师范大学学报(自然科学版),2016,50(6):860-866. [19] 郑红星,尹昊,曹红雷,石岳.考虑潮汐影响的离散型泊位和岸桥集成调度[J].运筹与管理,2017,26(6):167-175. [20] lvarez M, Carballo R, Ramos V, et al. An integrated approach for the planning of dredging operations in estuaries[J]. Ocean Engineering, 2017, 140: 73-83. [21] Tang G, Wang W, Guo Z, et al. Simulation-based optimization for generating the dimensions of a dredged coastal entrance channel[J]. Simulation, 2014, 90(9): 1059-1070. [22] 谢继勇.基于神经网络的港口清淤工程预警系统[D].天津大学,2004. [23] Türkogˇullarl Y B, Takln Z C, Aras N, et al. Optimal berth allocation and time-invariant quay crane assignment in container terminals[J]. European Journal of Operational Research, 2014, 235(1): 88-101. [24] Liu M, Lee C Y, Zhang Z, et al. Bi-objective optimization for the container terminal integrated planning[J]. Transportation Research Part B: Methodological, 2016, 93: 720-749. [25] Lim A. The berth planning problem[J]. Operations Research Letters, 1998, 22: 105-110. [26] Chazelle B. The bottomn-left bin-packing heuristic: an efficient Implementation[J]. IEEE Transactions on Computers, 1983, 32(8): 697-707. [27] Man K F, Tang K S, Kwong S. Genetic algorithms: concepts and applications[J]. IEEE Transactions on Industrial Electronics, 1996, 43(5): 519-534. [28] Zhang Y, Wang S, Ji G. A comprehensive survey on particle swarm optimization algorithm and its applications[J]. Mathematical Problems in Engineering, vol. 2015, Article ID 931256, 38 pages, 2015. [29] Suman B, Kumar P. A survey of simulated annealing as a tool for single and multiobjective optimization[J]. Journal of the Operational Research Society, 2006, 57(10): 1143-1160. [30] Rodriguez-Molins M, Salido M A, Barber F. A GRASP-based metaheuristic for the berth allocation problem and the quay crane assignment problem by managing vessel cargo holds[J]. Applied Intelligence, 2014, 40(2): 273-290. |