ZHOU Guohua, ZHANG Huake. Optimization of Construction Schedule of the Railway Extra-long Tunnel Based on Multiple Working Faces[J]. Operations Research and Management Science, 2023, 32(9): 21-27.
[1] TANG Y J, LIU R K, WANG F T. Scheduling optimization of linear schedule with constraint programming[J]. Computer-Aided Civil and Infrastructure Engineering, 2018, 33(2): 124-151. [2] OLIVIERI H, GRANJA A D. Improving workflow and resource usage in construction schedules through location-based management system (LBMS)[J]. Construction Management and Economics, 2018, 36(2): 109-124. [3] SU Y, LUCKO G. Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions[J]. Automation in Construction, 2016, 70: 38-50. [4] GEORGY M E. Evolutionary resource scheduler for linear projects[J]. Automation in Construction, 2007, 17(5): 573-583. [5] TAMIMI S, DIEKMANN J. Soft logic in network analysis[J]. Journal of Computing in Civil Engineering, 1988, 2(3): 289-300. [6] EL-SERSY A H E. An intelligent data model for scheduling updating[D]. Berkeley: University of California, 1993. [7] 张立辉,邹鑫,乞建勋.考虑软逻辑的重复性项目离散时间成本权衡问题[J].系统工程学报,2013,28(4):554-561. [8] FAN S L,SUN K S,WANG Y R. GA optimization model for repetitive projects with soft logic[J]. Automation in Construction, 2012, 21: 253-261. [9] 王伟鑫,葛显龙,王旭,等.基于软逻辑关系的重复性项目调度工期:成本优化研究[J].管理工程学报,2017,31(1):201-207. [10] ZOU X, ZHANG L H. A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic[J]. Automation in Construction, 2020, 109: 102990. [11] MOSELHI O, EL-RAYES K. Scheduling of repetitive projects with cost optimization[J]. Journal of Construction Engineering and Management, 1993, 119(4): 681-697. [12] DE P, DUNNE E J, GHOSH J B, et al. Complexity of the discrete time-cost tradeoff problem for project networks[J]. Operations Research, 1997, 45(2): 302-306.