[1] 吴建勋.高校突发事件与应急管理[J].科技进步与对策,2004,(7):113-115. [2] H m l inen R P, Lindstedt M R K, Sinkko K. Multiattribute risk analysis in nuclear emergency management[J]. Risk Analysis, 2000, 20(4): 455-468. [3] Mavrotas G, Calogjorou Y, Koune J. A model on cash flow forecasting and early warning for multi-project programmes: application to the operational programme for the information society in greece[J]. International Journal of Project Management, 2005, 23: 121-133. [4] Hanna A S, Gunduz M. Early warning signs for distressed projects[J]. Canadian Journal of Civil Engineering, 2005, 32(5): 796-802. [5] Akgun I, Kandakoglu A, Ozok A F. Fuzzy integrated vulnerability assessment model for critical facilities in combating the terrorism[J]. Expert Systems with Applications, 2010, 37(5): 3561-3573. [6] 张华伦,孙毅.企业财务危机预警Rough-Fuzzy-ANN模型的建立及应用[J].运筹与管理, 2006(2):103-107. [7] 徐玖平,卢毅.地震灾害系统分析与评估的综合集成模式[J].系统工程理论与实践,2009,29(11):1-18. [8] Foata D, Han G N. New permutation coding and equidistribution of set-valued statistics[J]. Theoretical Computer Science, 2009, 410(38-40): 3743-3750. [9] 黄玉祥,朱瑞祥,郭康权.农机装备项目筛选方法探讨及决策预警[J].系统工程理论与实践, 2006(10):130-136. [10] 黄继鸿,柯孔林.基于集值统计的技术创新风险度量及其预警[J].科学学研究,2005,23(2): 274-275. [11] Joshi R, Banwet D K, Shankar R. A Delphi-AHP-TOPSIS based benchmarking framework for performance improvement of a cold chain[J]. Expert Systems with Applications, 2011, 38(8): 10170-10182. [12] Vidal L A, Marle F, Bocquet J C. Using a Delphi process and the analytic hierarchy process(AHP)to evaluate the complexity of projects[J]. Expert Systems with Applications, 2011, 38(5): 5388-5405. [13] Xu Y L, Yeung J F Y, Chan A P C, et al. Developing a risk assessment model for PPP projects in China—a fuzzy synthetic evaluation approach[J]. Automation in Construction, 2010, 19(7): 929-943. [14] Yahya S, Kingsman B. Vendor rating for an entrepreneur development program: a case study using the analytic hierarchy process method[J]. Journal of Operation Research society, 1999, 50: 916-930. [15] 伍爱友,肖国清,蔡康旭.基于模糊识别的建筑物火灾危险性评价方法[J].中国安全科学学报,2004,14(5):72-75. [16] Kobes M, Helsloot I, Vries D B, et al. Building safety and human behaviour in fire: a literature review[J]. Fire Safety Journal, 2010, 45(1): 1-11. [17] Chu G Q, Sun J H. Decision analysis on fire safety design based on evaluating building fire risk to life[J]. Safety Science, 2008, 46(7): 1125-1136. [18] Yi G W, Qin H L. Fuzzy comprehensive evaluation of fire risk on high-rise buildings[J]. Procedia Engineering, 2011, 11: 620-624. |