[1] RUIZ R, PAN Q K, NADERI B. Iterated greedy methods for the distributed permutation flowshop scheduling problem[J]. Omega, 2019, 83: 213-222. [2] 李子辉,钱斌,方德斌,等.求解一类柔性装配流水车间调度问题的混合分布估计算法[J].管理工程学报,2017,31(4):200-208. [3] 唐红涛,刘家毅.改进的布谷鸟算法求解考虑运输时间的分布式柔性流水车间调度问题[J].运筹与管理,2021,30(11):76-83. [4] GAHM C, DENZ F, DIRR M, et al. Energy-efficient scheduling in manufacturing companies: A review and research framework[J]. European Journal of Operations Research, 2016, 248(3): 744-757. [5] 黄学文,陈绍芬,周阗玉,等.求解柔性作业车间调度问题的一种新邻域结构[J].系统工程理论与实践,2021,41(9):2367-2378. [6] LI J Q, SANG H Y, HAN Y Y, et al. Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions[J]. Journal of Cleaner Production, 2018, 181: 584-598. [7] WANG Y, LI L. Time-of-use electricity pricing for industrial customers: A survey of U.S. utilities[J]. Applied Energy, 2015, 149: 89-103. [8] GONG X, DEPESSEMIER T, MARTENS L, et al. Energy- and labor-aware flexible job shop scheduling under dynamic electricity pricing: A many objective optimization investigation[J]. Journal of Cleaner Production, 2019, 209: 1078-1094. [9] DABABNEH F, LI L, SHAH R, et al. Demand response driven production and maintenance decision making for cost effective manufacturing[J]. Journal of Manufacturing Science and Engineering, 2018, 140(6): 061008. [10] GONG X, LIU Y, LOHSE N, et al. Energy and labor-aware production scheduling for industrial demand response using adaptive multiobjective memetic algorithm[J]. IEEE Transactionson Industrial Informatics, 2019, 15(2): 942-953. [11] 刘彩洁,徐志涛,张钦,等.分时电价下基于NSGA-II的柔性作业车间绿色调度[J].中国机械工程,2020,31(5):576-585. [12] WANG S, LIU M. Two-machine flow shop scheduling integrated with preventive maintenance planning[J]. International Journal of Systems Science, 2016, 47(3): 672-690. [13] AGGOUNE R. Minimizing the makespan for the flow shop scheduling problem with availability constraints[J]. European Journal of Operational Research, 2004, 153(3): 534-543. [14] CUI W, LU B. A bi-objective approach to minimize makespan and energy consumption in flow shops with peak demand constraint[J]. Sustainability, 2020, 12(10): 4110. [15] 巴智勇,袁逸萍,戴毅,等.考虑机器故障的作业车间调度方案鲁棒测度方法[J].计算机集成制造系统,2020,26(12):3341-3349. [16] BRANDA A, CASTELLANO D, GUIZZI G, et al. Metaheuristics for the flow shop scheduling problem with maintenance activities integrated[J]. Computers & Industrial Engineering, 2021, 151: 106989. [17] CUI W, LU Z, LI C, et al. A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops[J]. Computers & Industrial Engineering, 2018, 115: 342-353. |