Study of Bi-objective Project Portfolio Selection Model Basedon the Capital Present Value Constraints
LI Xing-mei1, WEI Han-jing1,2
1.School of Economics and Management, North China Electric Power University, Beijing 102206, China; 2.Beijing Beizhong Steam Turbine Generator Limited Liability Company, Beijing 100040, China
LI Xing-mei, WEI Han-jing. Study of Bi-objective Project Portfolio Selection Model Basedon the Capital Present Value Constraints[J]. Operations Research and Management Science, 2016, 25(6): 139-143.
[1] Russell A. Cash flows in networks[J]. Management Science, 1970, 16(5): 357-373. [2] Walter J G, Stefan K, Peter R, Stummer C, Denk M. Multi-objective decision analysis for competence-oriented project portfolio selection[J]. European Journal of Operational Research, 2010, 205(3): 670-679. [3] Ghorbani S, Rabbani M. A new multi-objective algorithm for a project selection problem[J]. Advances in engineering software, 2009, (1): 9-14. [4] Lean Y, Wang S Y, Wen F H. Genetic algorithm-based multi-criteria project portfolio selections[J]. Annals of Operations Research, 2012, 197: 71-86. [5] Andres L M, Darrell H, Juan C M, et al. A multiobjective model selection and timing of public enterprise projects[J]. Socio-Economic Planning Sciences, 2008, 42: 31-45. [6] 徐斌,方卫国,刘鲁.多项目多期组合投资优化的双目标随机机会约束模型[A].第三届不确定系统年会论文集,南京,2005.167-174. [7] 周洪涛,王宗军,宋海刚.基于模糊优化的多目标投资组合选择模型研究[J].华中科技大学学报,2005,33(1):108-110. [8] Li X M, Fang S C, Tian Y, Guo X L. Expanded model of the project portfolio selection problem with divisibility, time profile factors and cardinality constraints[J]. Journal of the Operational Research Society, 2014.Doi:10.1057/jors.2014.75. [9] 魏传江,王浩,谢新民.GAMS用户指南[M].北京:中国水利水电出版社,2009.