[1] Herroelen W, Reyck B D, Demeulemeester E. Resource-constrained project scheduling: a survey of recent developments[J]. Computers and Operations Research, 1998, 25(4): 279-302. [2] Kolisch R, Padman R. An integrated survey of deterministic project scheduling[J]. Omega, 2001, 29 (3): 249-272. [3] Herroelen W, Dommelen P V, Demeulemeester E. Project network models with discounted cash flows: a guided tour through recent developments[J]. European Journal of Operational Research, 1997, 100(1): 97-121. [4] 何正文,贾涛,徐渝.截止日期约束下的融资费用最小化项目调度[J].系统工程学报,2009,24(4):494-498. [5] Kastor A, Sirakoulis K. The effectiveness of resource levelling tools for resource constraint project scheduling problem[J]. International Journal of Project Management, 2009, 27(5): 493-500. [6] Wuliang P, Chengen W. A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution[J]. International Journal of Project Management, 2009, 27(6): 600-609. [7] Zhengwen H, Yu X. Multi-mode project payment scheduling problems with bonus-penalty structure[J]. European Journal of Operational Research, 2008, 189(3): 1191-1207. [8] Zhengwen H, Nengmin W, Tao J, Yu X. Simulated annealing and tabu search for multi-mode project payment scheduling[J]. European Journal of Operational Research, 2009, 198(3): 688-696 [9] Herroelen W, Leus R. Project scheduling under uncertainty: survey and research potentials[J]. European Journal of Operational Research, 2005, 165(2): 289-306. [10] Bengtsson L, Berggren C. The integrator's new advantage-the reassessment of outsourcing and production competence in a global telecom firm[J]. European Management Journal, 2008, 26(5): 314-324. [11] 柴国荣,徐渝,张静文,何正文.多模式柔性资源约束型折现流项目进度问题研究[J].系统工程,2005, 23(2):14-18. [12] 柴国荣.多模式柔性资源约束型项目调度问题研究[D].西安交通大学,2005. [13] 青木昌彦,安藤晴彦.模块时代:新产业结构的本质[M].上海:上海远东出版,2003. [14] Browning T R. Applying the design structure matrix to system decomposition and integration problems: a review and new directions[J]. IEEE Transactions on Engineering Management, 2001, 4(3): 292-306. [15] Danilovic M, Browning T R. Managing complex product development projects with design structure matrices and domain mapping matrices[J]. International Journal of Project Management, 2007, 25(3): 300-314. [16] 何正文,徐渝,朱少英.不同支付方式下的多模式项目支付进度问题研究[J].运筹与管理,2005,14(5): 7-21. |