[1] 但斌,王江平,刘瑜.MC环境下客户需求信息分类模型及其表达方法研究[J].计算机集成制造系统,2008,14(8):1504-1511. [2] Graman G A, Magazine M J. A numerical analysis of capacitated postponement[J]. Production and Operations Management, 2002, 11(3): 340-357. [3] 纪雪洪,陈荣秋,唐中君.供应链中延迟研究的发展与展望[J].管理工程学报,2007,21(4):62-67. [4] Graman G A. A partial-postponement decision cost model[J]. European Journal of Operational Research, 2010, 201(1): 34-44. [5] 邵晓峰,汪蓉.MC中多个产品区分点延迟问题的研究[J].系统工程理论方法应用,2001,10(4):332-336. [6] 邵晓峰,季建华.MC中延迟生产策略对库存成本的影响[J].系统工程理论方法应用,2004,13(5):385-389. [7] 饶凯,但斌,刘瑜.MC下制造商延迟生产的成本优化模型[J].计算机集成制造系统,2007,13(9):1665-1671. [8] 但斌,饶凯,李海燕.MC环境下供应链实施延迟生产的成本优化模型[J].计算机集成制造系统,2009,15(2):287-291. [9] 徐和,顿彩霞,邹旭霞.基于异质性顾客群的零售商补货及反应性定价策略研究[J].中国管理科学,2011,19(5):115-121. [10] Lee H L. Effective inventory and service management through product and process redesign[J]. Operations Research, 1996, 44(1): 151-159. [11] Lee H L, Tang C S. Modeling the costs and benefits of delayed product differentiation[J]. Management Science, 1997, 43(2): 40-53. [12] Ebru K B, Rawee S. Optimal capacity for substitutable products under operational postponement[J]. European Journal of Operational Research, 2010, 207(2): 775-783. [13] Wong H, Wikner J, Naim M. Analysis of form postponement based on optimal positioning of the differentiation point and stocking decisions[J]. International Journal of Production Research, 2009, 47: 1201-1224. |