[1] Li B, Akintoye A, Edwards P J, Hardcastle C. Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK: Findings from a questionnaire survey[J]. Construction and Architecture Management, 2005, 12(2): 125-148. [2] Ke Y, Wang S Q, Chan A P C. Risk allocation in public-private partnership infrastructure projects: comparative study[J]. Journal of Infrastructure Systems, 2010, 16(4): 343-351. [3] 汪勇杰,陈通,邓斌超.公共文化PPP 项目风险分担的演化博弈分析[J].运筹与管理,2016,25(5):21-27. [4] Shen LY, Li H. Alternative concession model for build operate transfer contract projects[J]. Journal of Construction Engineering and Management, 2002, 128(4): 326-330. [5] 高颖,张水波,冯卓.不完全合约下PPP项目的运营期延长决策机制[J].管理科学学报,2014,17(2):48-57. [6] Zhang X, Bao H J, Wang H, Skitmore M. A model for determining the optimal project life span and concession period of BOT projects[J]. International Journal of Project Management, 2016, 34(3): 523-532. [7] 宋金波,靳璐璐,付亚楠.高需求状态下交通BOT项目特许决策模型[J].管理评论,2016,28(5):199-205. [8] Yu C Y, Lam K C. A decision Support System for the determination of concession period length in transportation project under BOT contract[J]. Automation in Construction, 2013, Vol. 31: 114-127. [9] Engel E, Fisher R, Galetovic A. Least-present-value-of-revenue actions and highway franchising[J]. Journal of Political Economy, 2001, 109(5): 993-1020. [10] Engel E, Fisher R, Galetovic A. Privatizing highways in the united states[J]. Review of Industrial Organization, 2006, 29(1-2): 27-53. [11] Gustavo N, Gines R. Flexible-term contracts for road franchising[J]. Transportation Research Part A, 2004, 38(3): 163-179. [12] 宋金波,宋丹荣,富怡雯,戴大双.基于风险分担的基础设施BOT项目特许期调整模型[J].系统工程理论与实践,2012,32(6):1270-1277. [13] 王东波,宋金波,戴大双,韩首栋.BOT项目特许期决策方法研究评述[J].预测,2009,28(3):1-8. [14] Shrestha A, Chan T K, Ajibade A, Chen C, Martek I. Risks in PPP water projects in China: perspective of local governments[J]. Construction Engineering Management, 2017, 143(7): 1-12. [15] 宋金波,党伟,孙岩.公共基础设施BOT项目弹性特许期决策模式-基于国外典型项目的多案例研究[J].土木工程学报,2013,46(4):142-150. [16] 高颖,张水波,冯卓.PPP项目运营期间需求量下降情形下的补偿机制研究[J].管理工程学报,2015,29(2) ,93-102. [17] Liu B. Toward fuzzy optimization without mathematical ambiguity[J]. Fuzzy Optimization and Decision Making, 2002, 1(1): 43-63. [18] Hwang B G, Zhao X B, Gay M J S. Public-private partnership projects in Singapore: factors, critical risks and preferred risk allocation from perspective of contractors[J]. International Journal of Project Management, 2013, 31(3): 424-433. [19] Liu B. Uncertainty theory: an introduction to its axiomatic foundations[M]. Berlin: Spring-Verlag, 2004. [20] Liu B, Liu Y. Expected value of fuzzy variable and fuzzy expected value models[J]. IEEE Transactions on Fuzzy Systems, 2002, 10(4): 445-450. [21] Jiang ZQ, Sun P, Ji CM, Zhou J. Credibility theory based dynamic control bound optimization for reservoir flood limited water level[J]. Journal of Hydrology, 2015, 52(9): 928-939. [22] Pourrahmani E, Delavar M R, Mostafavi M A. Optimization of an evacuation plan with uncertain demands using fuzzy credibility theory and genetic algorithm[J]. International Journal of Disaster Risk Reduction, 2015, 14(9): 357-372. |