[1] Pusavec F, Krajnik P, Kopac J. Transitioning to sustainable production-part I: application on machining technologies[J]. Journal of Cleaner Production, 2010, 18(2): 174-184. [2] Zhang R, Chiong R, Michalewicz Z, Chang P C. Sustainable scheduling of manufacturing and transportation systems[J]. European Journal of Operational Research, 2016, 248(3): 741-743. [3] Gahm C, Denz F, Dirr M, Tuma A. Energy-efficient scheduling in manufacturing companies: a review and research framework[J]. European Journal of Operational Research, 2016, 248(3): 744-757. [4] Lei D, Guo X. An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective[J]. International Journal of Production Economics, 2015, 159(1): 296-303. [5] Ding J, Song S, Wu C. Carbon-efficient scheduling of flow shops by multi-objective optimization[J]. European Journal of Operational Research, 2016, 248(3): 758-771. [6] 李聪波,李鹏宇,刘飞,崔龙国,税虹. 面向高效低碳的机械加工工艺路线多目标优化模型[J].机械工程学报,2014,50(17):133-141. [7] Güereca L P, Torres N, Noyola A. Carbon footprint as a basis for a cleaner research institute in mexico[J]. Journal of Cleaner Production, 2013, 47(47): 396-403. [8] 张雷,马军,符永高,徐国浩,苏勇.产品装配过程碳排放解算[J].机械工程学报,2016,52(3):151-160. [9] Yildirim M B, Mouzon G. Single-machine sustainable production planning to minimize total energy consumption and total completion time using a multiple objective genetic algorithm[J]. IEEE Transactions on Engineering Management, 2012, 59(4): 585-597. [10] 蒋增强,左乐.低碳策略下的多目标柔性作业车间调度[J].计算机集成制造系统,2015,21(4):1023-1031. [11] Mashaei M, Lennartson B. Energy reduction in a pallet-constrained flow shop through on–off control of idle machines[J]. IEEE Transactions on Automation Science and Engineering, 2013, 10(1): 45-56. [12] Dai M, Tang D, Giret A, Salido M A, Li W D. Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm[J]. Robotics and Computer-Integrated Manufacturing, 2013, 29(5): 418-429. [13] 侯彬.考虑机器开关的并行机调度研究[J].工业工程与管理,2011,16(2):60-64. [14] 陈伟达,崔少东.考虑碳排放的废钢铁再制造多目标调度降维模型及算法[J].系统工程,2015,33(9):101-108. [15] Liu C G, Yang J, Lian J, Li W J, Evans S, Yin Y. Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time[J]. Journal of Cleaner Production, 2014, 85: 318-330. [16] 王君.最小化碳排放的可持续机器调度问题[J].控制与决策,2017,32(6):1063-1068. |