[1] Auzzir Z A, Haigh R P, Amaratunga D. Public-private partnerships (PPP) in disaster management in developing countries: a conceptual framework[J]. Procedia Economics and Finance, 2014, 18: 807-814. DOI: 10.1016/S2212-5671(14)01006-5. [2] Mota J, Moreira A C. The importance of non-financial determinants on public–private partnerships in Europe[J]. International Journal of Project Management, 2015, 33(7): 1563-1575. DOI: 10.1016/j.ijproman.2015.04.005. [3] Ni J Z, Melnyk S A, Ritchie, W J., Flynn, B F. Why be first if it doesn't pay? The case of early adopters of C-TPAT supply chain security certification[J]. International Journal of Operations & Production Management, 2016, 36(10): 1161-1181. DOI: 10.1108/IJOPM-01-2015-0041. [4] Liu J, Gao R, Cheah C Y J, Luo J. Evolutionary game of investors' opportunistic behaviour during the operational period in PPP projects[J]. Construction Management and Economics, 2017, 35(3): 137-153. DOI: 10.1080/01446193.2016.1237033. [5] 侯峻. PPP模式在城市公共产品投资中的应用研究[J]. 现代城市研究, 2008, 6: 21. [6] 叶晓甦, 石世英, 刘李红. PPP 项目伙伴主体, 合作环境与公共产品供给的关系研究——基于结构方程模型的分析[J]. 北京交通大学学报: 社会科学版, 2017, 16(1): 45-54. DOI: 10.16797/j.cnki.11-5224/c.20170105.005. [7] Zhang X. Win–win concession period determination methodology[J]. Journal of Construction Engineering and Management, 2009, 135(6): 550-558. DOI: 10.1061/(ASCE)CO.1943-7862.0000012. [8] Hayes R H, Garvin D A. Managing as if tomorrow mattered[J]. Harvard Business Review, 1982, 60(3): 70-79. [9] Ross S A. Uses, abuses, and alternatives to the net-present-value rule[J]. Financial Management, 1995: 96-102. [10] 傅涛松, 母小曼. 投资决策中实物期权法与净现值法的比较[J]. 经营与管理, 2011 (8): 101-103. DOI: 10.16517/j.cnki.cn12-1034/f.2011.08.021. [11] Myers S C. Determinants of corporate borrowing[J]. Journal of Financial Economics, 1977, 5(2): 147-175. DOI: 10.1016/0304-405X(77)90015-0. [12] Cheah C Y J, Liu J. Real option evaluation of complex infrastructure projects: The case of Dabhol Power[J]. Journal of Financial Management of Property and Construction, 2005, 10(1): 55-68. DOI: 10.1108/13664380580001064. [13] Cheah C Y J, Liu J. Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation[J]. Construction Management and Economics, 2006, 24(5): 545-554. DOI: 10.1080/01446190500435572. [14] Paddock J, Siegel D, Smith J. Option valuation of claims on physical assets: the case of off shore petroleum lease[J]. Quarterly Journal Economics, 1988, 103(3): 479-508. [15] 李岱. 企业技术创新战略投资最优时机的实物期权分析[J]. 系统工程, 2014, 32(1): 82-86. [16] Merton R C. Theory of rational option pricing[J]. Bell Journal of Economics and Management Science, 1973, 4(1): 141-183. [17] 曹国华, 陈冀. 基于随机利率和时间偏好不一致的实物期权定价[J]. 统计与决策, 2008(10): 36-38. [18] 曹国华, 章文芳, 陈艳丽. 随机利率下投资项目价值研究[J]. 技术经济, 2011, 30(4): 73-76. [19] 袁国军, 肖庆宪. 基于近似对冲跳跃风险的期权定价[J]. 系统工程, 2013, 31(3): 15-19. Yuan G. Xiao Q. The pricing options based on approximating hedge jump risk[J]. Systems Engineering, 2013, 31(3): 15-19. [20] 朱秀丽, 邱菀华. 基于实物期权的铁路地下化项目PPP模式投资决策分析[J]. 系统工程, 2011, 29(3): 117-120. [21] 李明顺, 陈涛, 滕敏. 交通基础设施PPP项目实物期权定价及敏感性分析[J]. 系统工程, 2011, 29(3): 67-73. [22] 唐文彬, 张飞涟, 马超群. 基于模糊实物期权的城市轨道交通项目投资价值[J]. 系统工程, 2011, 29(12): 110-115. [23] Galera A L L, Soliñ A S. A real options approach for the valuation of highway concessions[J]. Transportation Science, 2010, 44(3): 416-427. [24] Brouthers K D, Brouthers L E, Werner S. Real options, international entry mode choice and performance[J]. Journal of Management Studies, 2008, 45(5): 936-960. [25] Brouthers K D, Dikova D. Acquisitions and real options: The greenfield alternative[J]. Journal of Management Studies, 2010, 47(6): 1048-1071. [26] Ho S H, Liao S H. A fuzzy real option approach for investment project valuation[J]. Expert Systems with Applications, 2011, 38(12): 15296-15302. [27] Martins J, Marques R C, Cruz C O. Real options in infrastructure: Revisiting the literature[J]. Journal of Infrastructure Systems, 2013, 21(1): 04014026. [28] Dixit R K, Pindyck R S. Investment under uncertainty[M]. Princeton University Press, 2012. [29] Liu J, Yu X, Cheah C Y J. Evaluation of restrictive competition in PPP projects using real option approach[J]. International Journal of Project Management, 2014, 32(3): 473-481. [30] Xu Y, Chan A P C, Yeung J F Y. Developing a fuzzy risk allocation model for PPP projects in China[J]. Journal of Construction Engineering and Management, 2010, 136(8): 894-903. DOI: 10.1061/(ASCE)CO.1943-7862.0000189. [31] 柯永建, 王守清, 陈炳泉. 基础设施 PPP 项目的风险分担[J]. 建筑经济, 2008, 4: 31-35. DOI: 10.14181/j.cnki.1002-851x.2008.04.007. [32] 苏伯尼, 黄弘, 张楠. 基于情景模拟的城市内涝动态风险评估方法[J]. 清华大学学报 (自然科学版), 2015, 55(6): 684-690. DOI: 10.16511/j.cnki.qhdxxb.2015.06.014. [33] 杨春鹏, 吴冲锋, 吴国富. 实物期权中放弃期权与增长期权的相互影响研究[J]. 系统工程理论与实践, 2005, 25(1): 26-31. [34] 刘继才, 宋金龙. 基于实物期权的 PPP 项目投资评价研究[J]. 世界科技研究与发展, 2012, 34(3): 514-518. DOI: 10.16507/j.issn.1006-6055.2012.03.044. [35] Black F, Scholes M. The pricing of options and corporate liabilities[J]. Journal of Political Economy, 1973: 637-654. DOI: 10.1086/260062. [36] 刘继才, 唐丝丝, 刘永胜. 项目融资风险分析与污水处理项目特许期决策[M]. 北京: 科学出版社, 2014: 88-100. |